Nyamba B Hydroelectric project, Uganda

2015

Hydrological modeling of an ungauged watershed for hydroelectricity production assessment. The calibration on adjacent gauged watershed with similar land use and transposition to the lower portion of the studied basin was made. The automated parameter optimization module was used to parameter calibration.